On most factory, water-plant and building projects you will see both terms in the single-line diagram: a PCC near the transformer and one or more MCCs around the plant. They are both LT (low-tension) switchboards and can look similar from the front, but they do different jobs.
The short answer
- A PCC (power control centre) receives power from the transformer and/or DG set and distributes it to large outgoing feeders: MCCs, lighting and power distribution boards, HVAC panels, capacitor panels.
- An MCC (motor control centre) receives power from the PCC and controls and protects individual motors, each with its own starter feeder.
Think of the PCC as the main road junction and the MCC as the set of driveways to each machine.
Side-by-side comparison
| PCC (power control centre) | MCC (motor control centre) | |
|---|---|---|
| Main job | Receive and distribute bulk power | Start, stop and protect motors |
| Fed from | Transformer, DG set, or both | The PCC (or a main distribution board) |
| Typical incomer | ACB (air circuit breaker), sometimes with DG changeover | ACB or MCCB |
| Typical outgoing feeders | ACBs and MCCBs to sub-panels and large loads | Motor feeders: breaker or MPCB, contactor, overload relay, plus starter |
| Busbar rating | High: often thousands of amps | Lower than the upstream PCC |
| Metering | Incomer metering, often power-quality metering, sometimes APFC | Ammeter and run/trip indication per motor |
| Controls | Few: mostly switching and protection | Many: push buttons, selector switches, interlocks, PLC signals |
What goes into an MCC feeder
Each motor gets its own feeder, sized to the motor. A typical feeder has:
- Short-circuit protection: an MPCB or MCCB.
- Switching: one or more contactors.
- Overload protection: a thermal or electronic overload relay (or a motor protection relay on larger motors).
- The starter arrangement: DOL for small motors, star-delta for medium motors, soft starter or VFD where a smooth start or speed control is needed.
- Indication and control: ON/OFF/TRIP lamps, start/stop buttons, Auto/Manual selector, and terminals for remote or PLC control.
Because motors are spread across a plant, MCCs are often placed close to the loads they serve to keep cable runs short.
What goes into a PCC
A PCC is built around high current and high fault level:
- Incomers from the transformer and DG, usually ACBs, with interlocking so the two sources are never connected together by mistake.
- Main busbars rated for the full site load and the prospective short-circuit current.
- Outgoing feeders to each MCC, PDB and large load.
- Metering on the incomer, and often an APFC (automatic power factor correction) panel connected alongside.
Form of separation
Both PCCs and MCCs are specified with a form of separation under IS/IEC 61439: from Form 1 (no internal barriers) through Forms 2, 3 and 4 (progressively more separation between busbars, functional units and terminals). A Form 3b or Form 4 MCC lets maintenance staff work on one feeder while the rest of the plant keeps running. That matters on continuous-process sites, but it costs more space and money. Specify what your operation actually needs.
Which do you need?
- Small site, a handful of motors: a single PMCC, one panel with an incomer, distribution and motor feeders, is usually the most economical.
- Medium to large site: a PCC at the transformer room feeding separate MCCs near each process area, plus lighting and power distribution boards.
- Adding machines to an existing plant: usually a new MCC fed from a spare feeder on the existing PCC. Check the PCC has the spare capacity and fault rating first.